The Wellington region will moved to Orange Level on Friday 3 December.
Read morePlease access our enquiry form below.
Bin Enquiry FormFees and charges include Goods and Services Tax (GST).
Service | Charge |
---|---|
Water connection application fee | $100.00 |
Fee for use of water by builders on unmetered industrial and commercial sites | $120.00 |
Service | Charge |
---|---|
Minimum charge | Uniform Annual Charge |
Service | Charge |
---|---|
Up to 100,000 cubic metres | $2.60 |
In excess of 100,000 cubic metres | $1.86 |
Service | Charge |
---|---|
Per cubic metre | $2.60 |
Minimum charge | $35.00 |
Service | Charge |
---|---|
Wastewater connection application fee | $100.00 |
Wastewater connection fee | Actual cost to approved contractors |
Trade waste class | Consent charge | Consent + $165 if conditional consent required |
---|---|---|
Class 1: high risk | $1,660.00 | $1,825.00 |
Class 2: moderate risk | $840.00 | $1,005.00 |
Class 3: low risk | $470.00 | $635.00 |
Class 4: minimal risk | $250.00 | $415.00 |
Class 5: minimal risk with low flow | $125.00 | N/A |
Application charge | $95.00 | |
Re-inspection charge | $115.00 | |
Late payment additional fee | $100.00 | |
Transfer additional fee | $47.50 |
See the trade waste user charges.
Service | Charge |
---|---|
Stormwater connection application fee | $100.00 |
Stormwater connection fee | Actual cost to approved contractors |
Water supply connection or alteration form (PDF 50 KB)
Private connection to wastewater or stormwater drainage network form (PDF 50 KB)