The Wellington region will moved to Orange Level on Friday 3 December.
Read morePlease access our enquiry form below.
Bin Enquiry FormInfringement | Charge |
Failure to display a valid Pay & Display ticket | $40.00 |
Overstaying excess time: | |
Less than 30 minutes | $12.00 |
More than 30 minutes but less than 1 hour | $15.00 |
More than 1 hour but less than 2 hours | $21.00 |
More than 2 hours but less than 4 hours | $30.00 |
More than 4 hours but less than 6 hours | $42.00 |
More than 6 hours | $57.00 |
Parking on a mobility car park without displaying a valid mobility pass card | $150.00 |
These fees and charges include Goods and Services Tax (GST). You can pay fines online up to, and including, the 53rd day after the ticket has been issued.
There are four signboards located in Lower Hutt that can be hired out by the week. The weekly hire fees include installation and removal costs. Find out how to book a signboard. b
The hire fee per week includes installation and removal costs. All prices are exclusive of GST.
Number of signboards | Side A hire per week | Side A production per booking | Side B hire per week | Side B production per booking |
All four signboards | $520 | $640 | $440 | $640 |
Cambridge Terrace, Naenae signboard | $100 | $160 | $100 | $160 |
Ewan Bridge, Lower Hutt signboard | $140 | $160 | $140 | $160 |
Kennedy Good Bridge, Avalon signboard | $140 | $160 | $100 | $160 |
Waione Street Bridge, Petone signboard | $140 | $160 | $100 | $160 |
Total price for hiring = weekly hire fee + production costs + GST.
Subdivision inspection & approval charges | Charge |
---|---|
Boundary adjustment | $195.00 |
Additional lots/unit titles | |
3.43% of total construction cost for one new lot reducing by 0.07% for each additional lot to 0.7% for 40 or more additional lots. This is the minimum fee irrespective of whether any construction work is necessary. | $150.00 |
An accordance with Clause 6.5 Corridor Manager Cost Recovery in the National Code, Council is able to recover costs in administering and monitoring Corridor Access Requests (CAR) consent compliance.
Since 1 July 2015 Hutt City Council aligns itself with Upper Hutt City Council’s fees and charges for processing CAR. This includes charging a fee for texturizing seal coats where trenches are located within the carriageway.
Request type | Charge |
Corridor Access Request - Minor Work (per CAR request) | $175.00 |
Corridor Access Request - Major Work (per CAR request) | $215.00 |
Corridor Access Request - Project Work (per CAR request) | $1075.00 |
Fee the texturizing seal coat of a trench in carriageway | $7.00/m2 |
Re-inspection Fee | $200.00 |
Motor crossings | Standard charge | Admin/ inspection charge |
---|---|---|
Concrete dished crossing/m2 | $180.00 | $160.00 |
Extensions to existing concrete crossings/m2 | $180.00 | $160.00 |
Installation of concrete dished crossing in conjunction with road reconstruction work/m2 | $80.00 | $160.00 |
Concrete block crossing/pipe crossing/'Slot' type crossing/m2 | $180.00 | $160.00 |
Deposit for privately installed crossing ($300 refunded upon satisfactory completion of crossing) | $500.00 | |
Deposit for installation of a Heavy Duty or Extra Heavy Duty vehicle crossing ($500.00 refunded upon satisfactory completion of crossing) | $700.00 |
Proposals, administration and monitoring are on time basis.